Floor Installation Labor Hours and Crew Duration Calculator

Estimate crew hours and workdays from floor area, production rate, and crew size.

Inputs

Project inputs

Range: 1–100,000 ft2

Range: 0.1–500

Enter an observed or job-specific rate for this floor, installation method, layout and site; 25 is an editable example only, not a standard productivity rate.

Range: 1–20

Range: 1–24

Result

Estimated crew elapsed hours
10.56 h
Estimated crew workdays
1.32
Estimated total worker-hours
21.12 h

How this is calculated

Estimated total worker-hours
—